Ahli: Potensi PLTP Gunung Ungaran Masih Perlu Dibuktikan Lewat Eksplorasi
- Geothermal expert from ITB Ali Ashat supports continued exploration of the PLTP Gunung Ungaran project.
- The project is listed in the 2025–2034 RUPTL with a potential capacity of around 55 MW.
- Ali stated the 55 MW potential must still be proven through exploration drilling.